Today brought a flurry of activity as the cabinet installation progressed along with the plumbing of the new gas line to the island. Jim and Robert worked to finish placing the base cabinets and then hung the upper cabinets with precision to insure an exact amount of workspace in between. Jim also worked on placing the island, coordinating with John so the new gas line would be in the proper position based on the range installation requirements. Of course, the range arrived today in the midst of the fun and thankfully John and Scott checked the gas line with 'smoke' and found a leak that needed to be addressed. The gas line was a bit more difficult to add than originally planned and John assisted Scott in getting over the challenges. All in all, a lot of work was completed - as evidenced in the pictures below.